Wohnmöbel
  • nobilia elements Wohnmöbel sofort verfügbar

    NOBILIA ELEMENTS LIVING ROOM FURNITURE

  • Wohnzimmer Lowboards Wohnwände

    LIVING ROOM LOWBOARDS LIVING WALLS

  • nobilia Esszimmer Speisezimmer Möbel

    DINING ROOM

  • Flur Set Flurgarderobe online kaufen

    HALLWAY & WARDROBE

  • Begehbarer Kleiderschrank online konfigurieren und sofort bestellen

    WALK-IN WARDROBE

  • Küche
  • nobilia Küchen
  • nobilia elements Sofort verfügbare Küchen
  • nobilia Küchenschränke direkt ab Werk online bestellen
  • nobilia Küchen-Zubehör & Elektrogeräte
  • Pino Küchen direkt online kaufen
  • 3D ONLINE KÜCHENPLANER
  • nobilia Küchenplaner Küche online konfigurieren
  • ONLINE KITCHEN PLANNING WITH PRICES - configure today / pick up tomorrow

  • With our innovative online kitchen planner, you can plan an immediately available nobilia kitchen made of high-quality nobilia kitchen cabinets and optional electrical appliances. The TOP-SHELF.de 3D online kitchen planner is very fast, easy to use, completely free of charge and immediately shows you our transparent prices!

  • Bad
  • Badschränke online konfigurieren und bestellen

    BATH ROOM CABINETS

  • Badezimmer Zubehör

    BATHROOM ACCESSORIES

  • Badmöbel Sets online konfigurieren

    BATHROOM FURNITURE SETS

  • NOBILIA ELEMENTS BATH & LIVING CATALOGUE



  • WHAT SERVICES ARE INCLUDED WITH KITCHEN ASSEMBLY?

    • Delivery and Contracts to Purpose/Location
    • Installation and connection of all electrical devices included in the scope of delivery
    • Cold/hot water connection
    • Installation and connection of the dishwasher (if provided for in the kitchen), inlet and outlet hose in standard length are included in the scope of delivery of the kitchen
    • Assembly of the kitchen furniture including wall fixings (not possible with plasterboard walls less than 25 mm thick))
    • Installation of wall end profiles, base panels and niche cladding
    • Worktop cut-outs for hobs and sinks
    • Installation of the hob/glass ceramic hob
    • Stove and hotplate/ceramic hob connection
    • Installation of extractor hoods (incl. recirculation set if available)
    • Installation of working lights
    • Assembly, installation and connection of sinks, mixer taps and siphons (the scope of delivery of the kitchen does not include a siphon or fitting, please make these available for assembly)
    • Adjustment of the plinth panels
    • Notching of cabinet parts as long as the statics of the body are not affected
    • Use of ALU sealing tape for open cut edges of wooden parts
    • Countertop cuts/adjustments (except stone/acrylic)
    • Joint final acceptance and functional test of the fully assembled kitchen including the electrical appliances with the customer (customer confirms acceptance by signing the delivery note; if necessary, documentation of deviations)

    PLEASE NOTE THE FOLLOWING NOTES:

    • The delivery time of the kitchen may vary extend, yes delivery and assembly am the same day be performed.
    • The Long and depth of space must be sufficient to accommodate the kitchen to assemble completely. When measuring, please pay attention to possible sloping ceilings, pipes or similar devices that could impede the kitchen installation.
    • The water connections and waste water pipes must be in the correct position to make it possible to connect the sink or a dishwasher. The angle valve intended for connection to the water network must be suitable and intact. Connection to low-pressure devices (boiler, flow heater) is not possible.
    • Power connections, sockets and water connections must be available and should not be located directly behind the devices.
    • To connect the electric cooker, there must be connections in accordance with the VDE regulations that are no more than 1.20 m away from the device.
    • It is not possible to make changes to stainless steel products (e.g. shortening of chimney hood shafts), to connect used devices to the electricity/water supply or to connect gas hobs/stoves.
    • Glass processing (e.g. niche cladding) cannot be carried out.
    -

    -